Machine production stage

Date:2017-03-15 11:33

After the program editor , our engeer input the program into CNC machine , this product need turn over 6 surface to processing , divided into three surface discharge, Two side of the characteristics of the need to discharge out. Processing on the CNC need about 7 hours 。